1. Fix the proper clamps on the machine rack.
2. Put HDPE pipes on the clamps and tighten the bolts.
3. Mill the end of the HDPEpipes with the facer.
4. Put the heater plate on the machine rack and heat the pipes for proper time. 5. Remove the heater plate and connect the HDPE pipes.















